Construction of Bucarest Metro Line 5. Romania
Works in tunnels and stations of Bucharest Metro line 5.
The works consist in performing the slab concreting work of the slab in tunnel gallery and metro station.
The works are related to:
- Works in tunnel gallery; invert Membrane placement, shuttering side tapes, steel framework, laying pipe for pumping , concrete by stationary pump , finishes and final touches.
- Works in metro station, drills execution, steel framework, placement of drainage tubes, wall formwork, manholes and side covers, pump tube placement, concrete by stationary pump, finishes and final touches.
Starting date: August 2016
Finish date: Current
Number of workers: 27