Prefabricated of reinforced concrete frames park for ODT
By our own, we assembled a fabricated fleet, in which are being executed the prefabricated parts of the cross drainage. the sizes of the pieces are the following ones:
•1,50 x 2,00 x 2,00
•2,00 x 2,00 x 2,00
•2,50 x 2,00 x 2,00
Total length of the prefabricated frameworks: 4.200,00 m
After the manufacture, we proceed to placement of those prefabricated parts on the works.
Starting date: april 2014
Finish date: 2015
Number of workers
Expatriate workers: 8
Local workers: 12